Hazero Flexi Bund - Alloy Stripping and Anchors

SKU: 02-1014
Hazero Flexi Bund - Alloy Stripping and Anchors
Hazero Flexi Bund - Alloy Stripping and Anchors

Hazero Flexi Bund - Alloy Stripping and Anchors

SKU: 02-1014
  • In stock

Designed to secure Hazero Flexi Bund in heavier traffic areas. This specialist system helps prevent the bund from shifting, maintains the bund system’s integrity, and protects the workplace and the environment from accidental spills or leaks.

Each metre of Alloy Stripping comes with seven nylon anchors.

NOTE: We recommend using an impact drill with a 6.5mm bit to pre-drill holes in the stripping and 30mm into the floor before inserting the anchor and either screwing, or tapping, the expansion nail home.

• Easy to install
• Holds fast even in heavy use areas
• Alloy Stripping is supplied with seven nylon floor anchors

Download Spec sheet
Hazero have a network of distributors around NZ: do you have a safety supplier you would prefer to purchase our products through?

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.

More from Contain
Hazero Spill Tray - 20L (01-1032)
Hazero Spill Tray - 40L (01-1036)
Hazero Spill Tray - 60L (01-1038)
Hazero Spill Tray - 100L (01-1040)
Hazero Work Floor - Small (01-1022)
Hazero Work Floor - Large (01-1023)
Recently viewed